Beaumeade Data Center

IN BIM
Architect:
Randall-Paulson Architects
Contractor:
DPR Construction
Location:
Ashburn, Virginia
Date Completed:
2011
Est. Construction Cost:
$7.5 Million
About Project

PES provided structural design services for this 152,504 SF, one-story steel framed data center. The building’s shell consisted of load bearing tilt-up concrete panels and is supported on a shallow foundation system. The building’s design features a 24,000 SF office including a loading dock and staging areas for customers. PES designed the structure to meet Factory Mutual Global design criteria and the shell was designed to meet LEED silver certification criteria.


Services Provided:
Structural Engineering; Clash Detection

 