PES Engineers -

Enter your keyword

Holy Transfiguration Church

IN BIM, Community
Architect:
Smith Boland Architects
Contractor:
Hodges & Hicks
Location:
Marietta, Georgia
Date Completed:
Summer 2016
Est. Construction Cost:
$4.5 Million
About Project

PES is providing the design and details for a 23,000 SF, two-story addition to the existing PLC Building for Holy Transfiguration Greek Orthodox Church. Level 100 additions include (9) new classrooms, restrooms, stairs, an elevator, conference room and a large lobby. Level 200 additions include a new gymnasium, storage rooms, restrooms, stair, an elevator, concessions and a gathering lobby. renovations for levels 100 and 200 include classrooms, library/conference room, administration spaces, replacement of the flooring in the kitchen, renovation of the Parish Hall configuration, and the addition of a new exterior door from the Parish Hall to the exterior plaza.

Services Provided: Structural Engineering; Structural Addition; Structural Renovation Services

 

Related Projects