Second Line Stages Expansion

Honors and Recognition

2018 Tilt-Up Achievement Award by the Tilt-Up Concrete Association – Commercial Category

ENR Southeast’s 2018 Best Projects: Excellence in Safety, Award of Merit

Structural Engineers Association of Georgia (SEOAG) 2020 Excellence in Structural Engineering Honorable Mention – New Buildings over $25 Million

PES is currently providing the structural design for the expansion of Second Line Stages, the first independent green film studio in the United States.

The project consists of 78,000 square feet of new studios and stages; 27,000 square feet of office space; and the renovation of an existing 90,000 square foot building that will consist of flex space and stages.

The structural system of the facility consists of steel trusses with steel beams for the roof as well as the grid system, reinforced slab-on-grade, and load-bearing precast concrete wall panels supported on a deep pile foundation system.

The TV and film studio’s existing three stages have served as a backdrop for numerous productions, including American Horror Story: Coven, Treme, Quentin Tarantino’s Django Unchained, and Lee Daniels’ The Butler.

Owner : Hackman Capital
Architect : Atlas Collaborative
Contractor : Impetus, a Palmisano Company
Location : New Orleans, LA
Completion : June 2023
Budget : $23 Million